EasyManua.ls Logo

Etec EKEPC3 - User Manual

Etec EKEPC3
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
EKEPC3ChargingPileOCCP-1.6J
protocolcontroller
Question and Answer IconNeed help?

Do you have a question about the Etec EKEPC3 and is the answer not in the manual?

Summary

Overview

Instruction for Using

About the Manual

Provides information on manual usage and validity.

Recycle and Treatment

Details on environmental compatibility and proper disposal of controller materials.

Safety Instruction

Precautions and Hazards

Covers general safety guidelines, warnings, and potential dangers during operation.

Fuse Information

Details about the internal self-resetting fuse and its purpose.

Repair Guidelines

Instructions regarding device repair and warranty implications.

Single Phase 32 A Wiring Diagram

PEN Disconnection Protection System

Single Phase 230 V AC Wiring Example

Three Phase 400 V AC Wiring Example

EKEPC3 Controller Guidance

Boot Distribution Network Setup

Connects to power and starts up, swipes card for network configuration.

Local Web Page Setup Instructions

Step 1: Controller Information Setup

Setting vendor, model, address, type, and connection mode for the controller.

Step 2: Network System Setup

Configuring Ethernet, WiFi, SIM, Static IP, Subnet Mask, Gateway, SSID, and password.

Step 3: OCCP Background Connection

Setting Backend URL, sample intervals, and heartbeat intervals for OCCP communication.

Step 4: Meter Register Address Setup

Configuring register addresses for accessing meter data via RS485.

Step 5: Charging Pile Function Setup

Enabling or disabling specific functions like DLB, RCUM, RFID, and voltage monitoring.

Step 6: Relevant Configuration Parameters

Setting parameters for cable/socket, phase connection, temperature calibration, and current/voltage limits.

Step 7: Pre-authorization Aspect Setup

Configuring limits for voltage, current, temperature, and contactor/plug lifetime.

Step 8: Other Settings

Configuring offline authorization, free charging, and simulation settings.

Step 9: Complete Configuration and Restart

Updating firmware, restoring factory settings, and rebooting the device.

Step 10: Save Configuration Recipe

Exporting and importing configuration files for future use.

Controller Indicator and LCD Display Guide

Dimensional Drawings

Etec EKEPC3 Specifications

General IconGeneral
BrandEtec
ModelEKEPC3
CategoryTest Equipment
LanguageEnglish