EasyManuals Logo

FAAC 390 24 V User Manual

FAAC 390 24 V
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
October, 2005
415 L LS Operator And
425 D Control Panel
Installation Manual
CONTENTS
T HE 415 L LS OPERATOR AND
425 D C
ONTROL PANEL:
I
NSTALLATION MANUAL
FAAC International, Inc.
303 Lexington Avenue
Cheyenne, WY 82007
www.faacusa.com
Important Safety Information 2
Technical Data 4
Unpacking the Operator 5
The 415 L LS Operator General Characteristics 6
Installation Instructions 6
Prepare the Gate 6
Manual Release Mechanism 6
Attach the Electric Cables 7
Install the Operator 7
Attach the Rear Mounting Bracket 8
Attach the Front Mounting Bracket to the Gate Leaf 8
Attach the Operator to the Rear Mounting Bracket 9
Attach the Operator to the Front Mounting Bracket 9
Adjusting the Limit Switches 10
Install the 425 D Control Panel 10
Exploded View, 415 L LS Operator 12
415 L LS Operator Parts List 13
The 425 D Control Panel General Description 14
Installing the 425 D Control Panel 14
Connect the Main Power Supply 14
Connect the Operator to the Control Panel 14
Connect Accessory Devices 15
Set Operating Modes 16
Setting the DIP Switches 17
Obstacle Recognition 17
Programming 19
Display Descriptions 20
Programming the Motor Run Time 20
Fuse Ratings 20
Maintenance 21
Safety in Gate Design 21
Troubleshooting 22
Limited Warranty 23
The 425 D Control Panel
Installation Instructions

Other manuals for FAAC 390 24 V

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FAAC 390 24 V and is the answer not in the manual?

FAAC 390 24 V Specifications

General IconGeneral
BrandFAAC
Model390 24 V
CategoryGate Opener
LanguageEnglish

Related product manuals