5 EN
7KHVHFKDSWHUVLQWKHPDQXDODUHWREHXVHGE\TXDOL¿HGDXWKRUL]HGWHFKQLFDOVWDII
WATER CONNECTIONS
• No leaks from the connections or tubes
FUNCTIONING
• Boiler and operating pressures are normal.
• The pressure gauge is working properly.
• The self-leveling device is working properly.
• The expansion valves are working properly
,QVWDOODWLRQ&KHFNXS
:$51,1* $)7(5,167$//$7,21&+(&. 726(( ,) 7+( 0$&+,1(,6:25.,1*3523(5/< VHHWKH
Installation Module C)
*52836
• +RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
• Let each group dispense water for about a minute.
+27:$7(5
• Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used for a
machine with 2 groups and 9 liters for a machine with 3 groups (see the “Cleaning and Maintenance” Chapter in the User’s
Manual).
67($0 (also with Autosteam)
• Dispense steam from the nozzles for about a minute, using the appropriate buttons.
:$51,1*: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
:25.(57267$57 86,1* 7+( 0$&+,1( :$6+7+( ,17(51$/ &20321(176$&&25',1*727+(
INSTRUCTIONS BELOW: