EasyManua.ls Logo

Faema X20 - Installation Check-up

Faema X20
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 EN
English
WARNING: AFTER INSTALLATION, CHECK IF THE MACHINE IS WORKING PROPERLY (see Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
COFFEE CIRCUIT
Press the coffee circuit quick wash icon
.
HOT WATER
Continuously dispense hot water (using the appropriate button) until at least 0.5 litres of water
have been used.
STEAM (where present)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
MILK CIRCUIT (where present)
Press the milk circuit wash icon
and proceed as indicated on the display.
SOLUBLES CIRCUIT (where present)
Press the soluble circuit wash icon
.
5. Installation Check-up
OPERATION
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working
properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE,
BEFORE ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE
INTERNAL COMPONENTS ACCORDING TO THE INSTRUCTIONS BELOW:
02_QUICK_UNICO_1815_USA_en_fr.indd 7 11/04/2018 11:24:39

Table of Contents

Related product manuals