1. POSITIONING
1.1 For the machine to work properly, you must ensure that it is level. Four
threaded bolts (legs) are supplied with your machine. These should be fitted to the
underside of the machine and adjusted to level the machine, as shown in Figure 1.
Figure 1
2. INSTALLATION
2.1 Connect the mains to the water supply, as shown in Figures 2 and 3. The
machine should be connected to a hot water supply of above 50°C but no more
than 60°C to allow the machine to operate efficient ly. Inlet operating pressure is
400 kPa and maximum inlet supply temperature is 60°C.
2.2 If the pressure is more than 70 PSI, a pressure limiting valve should be fitted.
Figure 2