2.1.5 Assembly of Splash Plate and Plate Shelf (G2102 C Only)
Fit as per instructions supplied with kit.
2.2 CONNECTION TO A GAS SUPPLY
The gas supply piping and connection to unit must be installed in accordance with the various
regulations listed on front page of this document. Refer further to Section 1.4 and check gas
soundness.
2.3 CONNECTION TO AN ELECTRICAL SUPPLY
The electrical connections must comply with relevant standards listed on the front page of this
document. Refer further to Section 1.5.
2.4 CONNECTION TO A WATER SUPPLY
Not applicable to these appliances.
2.5 PRE-COMMISSIONING CHECK and Pressure checking/setting (Natural gas appliances only).
Ensure lift-off hob with open-top burners (where applicable) or worktop and oven linings are
properly located. Check also that oven grid shelves slide in and out easily. Check all packing
material has been removed.
Check electric power cord is satisfactorily routed and not in contact with the appliance.
Important: It is necessary for gas pressure to be checked before the unit is commissioned. A
suitable pressure gauge must be connected to pressure test point(s) as follows:
2.5.1 Open Top Burners (where applicable).
Pull gas tap knobs off and remove control panel to access test point. Refer to Section 1.9 for
pressure settings. Three burners should be operating on full flame when setting burner operating
pressure.
The open top burner gas pressure is adjusted by means of external governor mounted at rear of
unit.