EasyManua.ls Logo

Faraday RSE-300 - AC Power Fault Reporting Delay

Faraday RSE-300
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15073 OWNER’S MANUAL
447179 Issue 1 Rev. A 33
5.1.4 Setting the AC Power Fault Reporting Delay
Normal selection for reporting loss of AC is 6 hours.
The OFF position is for test purposes only and the normal position for switch 9 is ON. For testing the Low
AC reporting, you can temporarily turn switch 4 OFF without removing power.
Remember to turn the switch ON when testing is complete.
Switch 9 OFF & Switch 10 OFF:
AC power fault reporting will not be delayed.
Switch 9 ON & Switch 10 OFF:
AC power fault reporting will be delayed 6 hours.
Switch 9 OFF & Switch 10 ON:
AC power fault reporting will be delayed 15 hours.
Switch 9 ON & Switch 10 ON:
AC power fault reporting will be delayed 24 hours.
Figure 5-5. Setting DIP Switch 9 and 10
10
9
8
7
6
6 7 8 9 10
ON
OFF
6 7 8 9 10
6 7 8 9 10
firealarmresources.com