EasyManua.ls Logo

FEC PP Series - Package Material List; Before Installation; Warranty Notes; Safety

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operational Start
FEC ITALIA 7
Package material list
Here's below packaging material list:
Supplied Material
1
15.6” PP-9745W
2
Base to assemble
3
AC Cable
4
x1 RJ-45 to D-sub9 Cable
5
20V 130W Power Supply
Before installation
Once the content's packaging is checked, it's advisable to keep it to
allow any computer's transport viable and safer.
After the unpackage, arrange all the materials on a work surface.
Then, carefully follow the instructions in the following chapters.
Warranty Notes
We recommend that you read the warranty certificate and make sure
that it has been filled in with the date of purchase, the dealer's
stamp, and the data relating to the model and serial number.
The latter can be found on the label glued to the back of the basic
module.
Safety
Carefully read these safety directions:
1) Unplug from the power outlet before cleaning,
disassembling, or transporting. Do not use liquid cleaners or
sprays for cleaning. Use only a damp cloth and avoid any
prolonged contact with moisture.
2) Lay the machine on a stable surface before maintenance or
use, to avoid accidental falls.
3) The panel's back grilles are ventings. DO NOT COVER.

Related product manuals