Do you have a question about the Firetrol FTA1000-1930-TSA and is the answer not in the manual?
Key technical specifications including ratings, operational parameters, environmental conditions, and protection.
Recommendations for storing the controller if not immediately energized, per NEMA ICS 15.
Guidelines for seismic approval, testing, installation, anchoring, and mounting requirements.
Requirements for installation location ambient temperature, humidity, altitude, and pollution degree.
Information on EMC testing for emissions and immunity compliance.
Instructions for handling controllers based on weight and provided lifting means.
Compliance requirements for FCC and Industry Canada RF exposure.
Guidelines for selecting and positioning the controller near the engine or motor.
Instructions for securely mounting the controller on a substantial supporting structure.
Procedure for attaching floor-mounted controllers using provided mounting feet.
Steps for securely mounting the controller to a wall using anchors.
Details on connecting the system pressure sensing line to the controller.
Requirements for electrical wiring between power source and controller per codes.
Essential safety and procedural notes for licensed electricians performing connections.
Step-by-step guide for making all field connections, including power and functions.
Details on automatic, manual, remote, and emergency starting methods.
Explanation of manual and automatic stopping procedures.
Procedure for automatic motor stoppage after pressure restoration, requires authorization.
Method for immediate motor stoppage using main disconnecting means.
Process of switching to the alternate power source when normal power fails.
Procedure for switching back to the normal power source after restoration.
How to execute a full transfer sequence using the test button.
Steps for manually operating the transfer switch in emergency situations.
Step-by-step guide for controller commissioning by authorized personnel.
Key technical specifications including ratings, operational parameters, environmental conditions, and protection.
Recommendations for storing the controller if not immediately energized, per NEMA ICS 15.
Guidelines for seismic approval, testing, installation, anchoring, and mounting requirements.
Requirements for installation location ambient temperature, humidity, altitude, and pollution degree.
Information on EMC testing for emissions and immunity compliance.
Instructions for handling controllers based on weight and provided lifting means.
Compliance requirements for FCC and Industry Canada RF exposure.
Guidelines for selecting and positioning the controller near the engine or motor.
Instructions for securely mounting the controller on a substantial supporting structure.
Procedure for attaching floor-mounted controllers using provided mounting feet.
Steps for securely mounting the controller to a wall using anchors.
Details on connecting the system pressure sensing line to the controller.
Requirements for electrical wiring between power source and controller per codes.
Essential safety and procedural notes for licensed electricians performing connections.
Step-by-step guide for making all field connections, including power and functions.
Details on automatic, manual, remote, and emergency starting methods.
Explanation of manual and automatic stopping procedures.
Procedure for automatic motor stoppage after pressure restoration, requires authorization.
Method for immediate motor stoppage using main disconnecting means.
Process of switching to the alternate power source when normal power fails.
Procedure for switching back to the normal power source after restoration.
How to execute a full transfer sequence using the test button.
Steps for manually operating the transfer switch in emergency situations.
Step-by-step guide for controller commissioning by authorized personnel.
| Brand | Firetrol |
|---|---|
| Model | FTA1000-1930-TSA |
| Category | Controller |
| Language | English |