EasyManua.ls Logo

Firetrol FTA2000 Series - User Manual

Default Icon
18 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
1
INSTALLATION AND MAINTENANCE GUIDE FOR
MARKIII MEDIUM VOLTAGE
ELECTRIC FIRE PUMP CONTROLLERS
MODEL SERIES: FTA2000
Question and Answer IconNeed help?

Do you have a question about the Firetrol FTA2000 Series and is the answer not in the manual?

Firetrol FTA2000 Series Specifications

General IconGeneral
ModelFTA2000 Series
Frequency50/60 Hz
Voltage208-600V
PhaseThree Phase
Starting MethodAcross the Line
EnclosureNEMA 4, NEMA 4X
ListingsUL Listed, CSA Certified
Input Voltage208-600V
Output Voltage208-600V
Humidity95% non-condensing
Output CurrentVaries by model
DimensionsVaries by model
WeightVaries by model

Summary

Introduction to Fire Pump Controllers

Methods of Starting and Stopping

Explains automatic, manual, remote, emergency, sequential, flow, and weekly start/stop methods.

Operational Procedures and Installation

Methods of Stopping

Details manual stop, automatic stop, flow stop, and emergency stop procedures.

Installation Requirements

Location Requirements

Specifies placement near motor, water protection, clearances, and ambient temperature.

Mounting Instructions

Details secure wall/floor mounting and seismic considerations.

Wiring and Connections

Covers water connection to the system and electrical wiring standards.

Electrical Setup and Connections

Electrical Connection Supervision

Emphasizes licensed electrician, watertight fittings, and debris protection during connections.

Wire Sizing and Incoming Power

Covers wire acceptance, sizing based on load, and incoming power terminal connections.

Motor Wiring and Terminal Identification

Identifies motor connection terminals and installer responsibility for proper connection.

Quick Start-Up Guide Overview

Installation Security Check

Advises verifying that the controller is securely installed on the wall or mounting stand.

Panel Connections and Piping

Drilling, Cable Routing, and Water Connections

Details drilling holes, running cables, and securing water input and drain connections.

Initial Controller Configuration

Power, Motor, and Torque Connections

Guides connecting input power and motor, applying torque, and verifying readings.

First Start Up Screen Operations

Explains the 'First Start Up' page, voltage detection, and frequency selection.

Voltage Validation

Motor Operation Checks

Pressure Settings and Setup Completion

Post-Setup Home Page Verification

Data Management and Service

Related product manuals