Page 18 of 18
• Remove chips, dust and foreign particles from machine table and bed.
• Wipe off oils, fluids and chips from machine table.
• Clean all sliding surfaces.
• Clean bearing wipers.
• Clean exposed surfaces on tools in tool carousel.
• With power off, carefully clean all electric components.
• Ensure that water accumulated on air filter container is properly drained.
• Check for visible leaks in the machine.
• Ensure that hoses and pipes are securely fitted and free from leaks.
Weekly Maintenance:
• Take all steps listed above for daily maintenance.
• Clean main spindle nose and ensure that there is no cracks or other external
damage.
• Verify that tool change and clamping operations can be easily performed.
Monthly Maintenance:
• Take all steps listed above for weekly maintenance.
• Clean electrical cabinet.
• Verify the machine for proper leveling and ensure that anchoring bolts are
securely tightened.
• Clean air filter and adjust it if necessary.
• Clean chip guards and replace if necessary.
• Check electro valve coils and limit switches for proper operation.
• Check for loose wire terminals.
• Check all interlocks, relays and timers for proper operation.
• Inspect coolant to insure correct concentration.
• Check NC unit for proper operation.
• If applicable, drain coolant and motor-pump unit.
• If applicable, replace pressure filter.
Six Month Maintenance:
• Take all steps listed above for monthly maintenance.
• Clean NC unit, electric cabinet and machine.
• Clean coolant tank, change coolant, and filters if required.
• Check bearings for strange noises.
• Run a test program to verify NC unit for proper operation.