OPERATION
5.1 First use
Flowrox valves are normally delivered fully assembled and ready to use. Check the
condition of the valve visually.
After installation to the pipeline, check that all connections are leak-proof.
5.2 During operation
During the operation the valve does not normally require any maintenance. The sleeve
change is described in 6.2.
To ensure smooth operation, it is recommended to change the valve sleeve regularly.
Regarding the actuators, follow the instructions of the manufacturer.
NOTE
Note the valve functions, see 2.3.