EasyManuals Logo

FLOWROX PV 80 User Manual

FLOWROX PV 80
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #10 background imageLoading...
Page #10 background image
8
5
OPERATION
5.1 First use
Flowrox valves are normally delivered fully assembled and ready to use. Check the
condition of the valve visually.
After installation to the pipeline, check that all connections are leak-proof.
5.2 During operation
During the operation the valve does not normally require any maintenance. The sleeve
change is described in 6.2.
To ensure smooth operation, it is recommended to change the valve sleeve regularly.
Regarding the actuators, follow the instructions of the manufacturer.
NOTE
Note the valve functions, see 2.3.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the FLOWROX PV 80 and is the answer not in the manual?

FLOWROX PV 80 Specifications

General IconGeneral
BrandFLOWROX
ModelPV 80
CategoryControl Unit
LanguageEnglish