SELECTING LOCATION
To determine the safest and most efcient
location for the replace, you must take into
consideration the following guidelines:
1. The location must allow for proper
clearances (see Figures 6 and 7).
2. Consider a location where replace will
not be affected by drafts, air conditioning
ducts, windows or doors.
3. A location that avoids cutting of joists or
roof rafters will make installation easier.
4. An outside air kit is available with this
replace (see Optional Outside Air Kit,
page 10).
MINIMUM CLEARANCE TO
COMBUSTIBLES
Back and sides of replace 1
1
/
2
" min.*
Front of replace 48" min.
Floor** 0" min.
Perpendicular wall to opening 12" min.
Top spacers 0" min.
Mantel clearances
see Mantels, page 10
Chimney outer pipe surface 1" min.
* Not required at nailing anges
** See step 2 of Framing
WARNING:Donotpackre-
quiredairspaceswithinsulation
orothermaterials.
FRAMING
1. Frame opening for replace using dimen-
sions shown in Figures 6 and 7.
2. If replace is to be installed directly on
carpeting, tile (other than ceramic) or any
combustible material other than wood
ooring, replace must be installed upon
a metal or wood panel extending full width
and depth of replace.
3. Set replace directly in front of this open-
ing and slide unit back until nailing anges
touch side framing.
4. Check level of the replace and shim with
sheet metal if necessary.
PRE INSTALLATION PREPARATION
71" (50" Models)
100" (50" Models)
65" (42" Models)
92" (42" Models)
86.5" (36" Models)
61" (36" Models)
Maintain 1
1
/2"
Clearance
at Sides and
Back of Fireplace
1
1
/2" Clearance
Not Required at
Nailing Flanges
Figure 7 - Corner Installation
5. Using screws or nails, secure replace to
framing through anges located on sides