EasyManua.ls Logo

Fronius PullMig - Page 5

Fronius PullMig
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and commissioning
Mounting the
torch neck
1
2
4
3
IMPORTANT! Risk of coolant leakage
(on water-cooled welding torches) or
damage from overheating (on gas-
cooled welding torches). When mount-
ing the torch neck, make sure that the
swivel nut is fixed firmly.
Assemble wire
guidance insert
1
1
1
1
2
2
2
When cutting the inner liner to length, make sure that
-
no burr (sharp edges) protrudes into the inner liner at the cut location.
-
Hold the side-cutting pliers at a slight angle (the burr is then pulled towards
the outside).
-
Grind off the burr
* Contact tube with centering bore
** Contact tube without centering bore
Ø 4 mm (.16 in.): 40,0002,0014; 40,0002,0015
Ø 4,7 mm (.19 in.): 40,0002,0004; 40,0002,0017
5
EN

Related product manuals