Fronius Symo 10.0-3 208-240 - Initial Startup and System Setup; Safety Precautions for Installation; Installing Datamanager in Solar Net

Fronius Symo 10.0-3 208-240
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
EN-US
1 2
3
If AC cables are laid over the shaft of the
DC main switch or across the DC main
switch connection block, the cables may be
damaged when the inverter is pivoted or the
inverter may not be able to be pivoted.
IMPORTANT! Do not lay AC cables over the shaft of the DC main switch or across the DC
main switch connection block!
0.6 in. (15 mm)
AC
~
PE
PE
PE
1
OFF
1
GNDGND
16 lbf.in
1.8 Nm
2
max. 80 A
AC ~
RCD
National Standards
?
Type A
YES
I
ΔN
100 mA
§
3