General - Isolate the inverter in its unloaded state from the AC grid and the DC power supply (set
DC disconnector to level 0).
- Refit and attach all removed Datcom lines (restore inverter to original state prior to the
repair or safety inspection).
- If necessary, reinstall the AC lead in the PG screw joint.
- Check whether conductive objects are deposited in the housing.
- Mount Datcom lid with 2 screws 5x25 TX25 – 2.5 Nm
General Deficiencies identified that may be the cause of other hazards must be repaired immedi-
ately, otherwise further use must be restricted until the defect is rectified.
- Missing or damaged housing parts, insulating parts, or protective covers.
- Soiling and blockage of cooling vents.
- Check that safety labels are present (such as warning notices, grounding symbols, rat-
ing plates) and replace, supplement, or correct if necessary.
- Ensure that all safety-related labels or symbols, rated values and position indicators
are legible.

Table of Contents

Other manuals for Fronius Symo 7.0-3-M

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fronius Symo 7.0-3-M and is the answer not in the manual?

Fronius Symo 7.0-3-M Specifications

General IconGeneral
AC nominal output7.0 kW
Max. input voltage1000 V
MPP voltage range200 - 800 V
Number of MPP trackers2
Protection classIP65
AC nominal voltage400 V
Frequency50 / 60 Hz
THD< 3%
Operating Temperature Range-25°C to +60°C
Warranty5 years
Max. apparent AC power7.0 kVA
Efficiency98.0%