EasyManua.ls Logo

FSI SLUG PRO - Shot Time Procedure

Default Icon
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRODUCTION AND QUALITY CONTROL
21
Quality Control (Q.C.) procedures are of utmost importance in manufacturing operations. Following the
procedures will assure the quality of urethane foam in the product. The procedures are as follows:
1. SLUG PRO START-UP PROCEDURE
2. RATIO PROCEDURE
3. THROUGHPUT PROCEDURE
4. REACTION PROFILE
a) String-Gel
b) Tack-Free
c) Density
5. SHOT TIME PROCEDURE
6. SHUT DOWN PROCEDURE
The following items are needed:
• Stopwatch
• Gram scale
• 30-gallon plastic bags
• Thin wire (e.g. coat hanger)
• Calculator
www.foamsupplies.com | www.ecomatetechnology.com | 1.800.325.4875

Table of Contents

Related product manuals