28
SLUG PRO SHUT-DOWN PROCEDURES
PRODUCTION AND QUALITY CONTROL
www.foamsupplies.com | www.ecomatetechnology.com | 1.800.325.4875
PROTECTIVE EYEWEAR AND GLOVES REQUIRED!
1. Push the Slide-Safety Valve to OFF (BACK) position.
2. Close All Four Ball-Valves at Dispensing Head.
3. Turn Air Supply OFF.
4. Remove Mix Tube Collar and Mix Tube.
5. Lubricate.
6. Grease SLUG PRO Unit through Grease Zerk (1-2 pumps).
7. Turn Timer and Heat-Box OFF.
8. Close Chemical and Nitrogen (N
2
) Ball-Valves on Chemical Cylinders.
9. Turn Nitrogen (N
2
) Supply OFF.
IMPORTANT
Read through all the steps before starting procedure. Please refer to the appropriate
SDS for proper safe handling including the use of safety glasses, protective gloves,
and respirator protection where needed.
For any reason if you do not understand, or are uncertain of any or all procedures and instructions given to you
by Foam Supplies, Inc. and its representatives, please contact our Application Specialist before attempting
procedures. We will be happy to assist.
OF F
OF F