EasyManua.ls Logo

FSI SLUG PRO - Shot Time Procedure

Default Icon
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRODUCTION AND QUALITY CONTROL
26
Shot times are determined from three factors:
1. VOLUME of void to be filled.
2. Desired IN-PLACE DENSITY.
3. Gun THROUGHPUT.
PROCEDURE:
1. Calculate VOLUME of object to be foam filled.
Example: Volume of Cube = Length x Width x Height
2. Determine desired IN-PLACE DENSITY.
3. Calculate # LBS. REQUIRED to FILL OBJECT (Volume multiplied by the In-Place Density).
Example: Volume = 4 cu. ft., In-Place Density = 2.3 lbs./cu. ft.
# lbs. required to fill part = 4 cu. ft. x 2.3 lbs./cu. ft.
# lbs. required to fill part = 9.2 lbs.
4. Calculate SHOT TIME (# lbs. Required divided by the Throughput).
Example: Throughput = 30 lbs./min., # lbs. Required to Fill = 9.2 lbs.
Convert Throughput from lbs./min. to lbs./sec.
Throughput = 30lbs./min ÷ 1min./60 sec. = .5 lbs./sec.
Example: _9.2 lbs. = 18.4 seconds
.5 lbs./sec.
Shot time = 18.4 seconds
SHOT TIME PROCEDURE
www.foamsupplies.com | www.ecomatetechnology.com | 1.800.325.4875

Table of Contents

Related product manuals