EasyManuals Logo

Fujitsu ADUH09LUAS1 Service Manual

Fujitsu ADUH09LUAS1
156 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #85 background imageLoading...
Page #85 background image
Check point 3. Check the solenoid coil and 4-way valve
Solenoid coil
Remove P60 from PCB and check the resistance value of coil. Resistance value is about 2.085
kΩ (for 09 model) or 1.97 kΩ (for 12/18 models) (at 68 °F (20 °C)).
 If it is open or abnormal resistance value, replace solenoid coil.
4-way valve
Check each piping temperature, and the location of the valve by the temperature difference.
If the value location is not proper, replace 4-way valve.
Check point 4. Check the voltage of 4-way valve
Check the voltage P60 of Main PCB.
 Check if AC 198 V (AC 220 V -10%) to AC 264 V (AC 240 V +10%) appears at P60 of Main PCB.
Heating operation
 If it is not voltage, Replace Main PCB.
Cooling operation
 If it is voltage, Replace Main PCB.
Check point 5. Replace main PCB
If Check Point 1 to 4 do not improve the symptom, replace main PCB.
End
2-27. E: 99. 4-way valve error (Outdoor unit) - (03-33) - 2. Troubleshooting with error code
TROUBLESHOOTING
TROUBLESHOOTING

Table of Contents

Other manuals for Fujitsu ADUH09LUAS1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu ADUH09LUAS1 and is the answer not in the manual?

Fujitsu ADUH09LUAS1 Specifications

General IconGeneral
BrandFujitsu
ModelADUH09LUAS1
CategoryAir Conditioner
LanguageEnglish

Related product manuals