19. DEFROST OPERATION CONTROL
1. CONDITION OF STARTING THE DEFROST OPERATION
The defrost operation starts when the outdoor heat exchanger temperature sensor detects
the temperature lower than the values shown in Table 14.
(Table 14 : Condition of starting Defrost Operation)
AS*A07/ 09/ 12/ 14LGC
Less than 25 minutes
25 minutes to
4 hours
Does not operate
Compressor operating time
After 4 hours
- 6°C - 3°C
2. CONDITION OF THE DEFROST OPERATION COMPLETION
Defrost operation is released when the conditions become as shown in Table 15.
(Table 15 : Defrost Release Condition)
Release Condition
Outdoor heat exchanger temperature sensor value is higher than
16°C or Compressor operation time has passed 15 minutes.
05-14
AS*A07/ 09/ 12/ 14LGC

Table of Contents

Other manuals for Fujitsu ASYA09LGC

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu ASYA09LGC and is the answer not in the manual?

Fujitsu ASYA09LGC Specifications

General IconGeneral
BrandFujitsu
ModelASYA09LGC
CategoryAir Conditioner
LanguageEnglish

Related product manuals