EasyManua.ls Logo

Fujitsu ETERNUS AB Series - Page 18

Fujitsu ETERNUS AB Series
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
|Controllers|
You have an ESD wristband, or you have taken other antistatic precautions.
Procedure
1. Put on an ESD wristband or take other antistatic precautions.
2. Label each cable that is attached to the controller canister.
3. Disconnect all the cables from the controller canister.
Attention: To prevent degraded performance, do not twist, fold, pinch, or step on the cables.
4. If the controller canister has a HIC that uses SFP+ transceivers, remove the SFPs.
Because you must remove the HIC from the failed controller canister, you must remove any SFPs from the
HIC ports. However, you can leave any SFPs installed in the baseboard host ports. When you reconnect the
cables, you can move those SFPs to the new controller canister.
5. Confirm that the Cache Active LED on the back of the controller is off.
6. Squeeze the latch on the cam handle until it releases, and then open the cam handle to the right to
release the controller canister from the shelf.
The following figure is an example of an HB5100 controller shelf:
Controller canister Cam handle
The following figure is an example of an HB5200 controller shelf:
18

Table of Contents

Other manuals for Fujitsu ETERNUS AB Series

Related product manuals