© Fulton Group N.A., Inc. 2022
2-34
INSTALLATION EDR-SOLA-IOM-2022-0216 SECTION 2
5. Do not terminate below operable windows and building openings unless
exception is granted by the authority having jurisdiction.
6. The vent terminations must be at least 4 ft (1.22 m) horizontally from
electric meters, gas meters, regulators, and relief equipment.
7. When installing inlet and exhaust terminations on the same wall, the
exhaust outlet must be installed 4 feet (1.22 m) minimum above and 10
feet (3.05 m) minimum downwind from air supply inlet to prevent ue gas
recirculation. Greater separation is strongly recommended.
8. Under certain wind conditions, some building materials may be aected
by ue products expelled in close proximity to unprotected surfaces.
Sealing or shielding of the exposed surfaces with a corrosion resistant
material (such as an aluminum sheet) may be required to prevent staining
or deterioration. Flue should be directed away from surfaces, if possible.
Removing an Existing Boiler
When an existing boiler is removed from a common venting system, the
common venting system is likely to be too large for proper venting of the
appliances remaining connected to it.
At the time of removal of an existing boiler, while the other appliances remaining
connected to the common venting system are not in operation, the following
steps should be followed with each appliance remaining connected to the
common venting system placed in operation:
1. Seal any unused openings in the common venting system.
2. Visually inspect the venting system for proper size and horizontal pitch and
determine that there is no blockage or restriction, leakage, corrosion or
other deciency, which could cause an unsafe condition.
3. Insofar as is practical, close all building doors and windows and all doors
between the space in which the appliances remaining connected to the
common venting system are located and other spaces of the building.
Turn on clothes dryers and any appliances not connected to the common
venting system. Turn on any exhaust fans, such as range hoods and
bathroom exhausts, so they will operate at maximum speed. Do not
operate a summer exhaust fan. Close replace dampers.
4. Place the appliance being inspected in operation. Follow the lighting
instructions. Adjust the thermostat so that the appliance will operate
continuously.
5. Test for spillage at the draft hood relief opening after 5 minutes of main
burner operation. Do not use the ame of a match or candle or smoke
from a cigarette, cigar or pipe.
6. After it has been determined that each appliance remaining connected
to the common venting system properly vents when tested as outlined
above, return doors, windows, exhaust fans, replace dampers and any
other gas-burning appliance to their previous conditions of use.
! WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
! WARNING
The rating of each external device contact
is the maximum allowable amperage of
the contact. The total Full Load Amps
(FLA) of external devices wired to the
Endura boiler power circuit cannot exceed
1A.