SECTION 2 EDR-SOLA-IOM-2022-0216 INSTALLATION
! WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
7. Any improper operation of the common venting system should be
corrected so the installation conforms with the National Fuel Gas Code,
ANSI Z223.1. When resizing any portion of the common venting system,
the common vent system should be resized to approach the minimum size
as determined using the appropriate tables.
Assembly of Fulton Multi-Skid Systems
Adhere to the following for multi-skid engineered systems:
1. Refer to the Fulton mechanical/electrical drawings during assembly.
2. Ensure that equipment orientation allows for operation interface and
maintenance.
3. Align the skids as shown on the drawings ensuring that skid fasteners (skid
joint angles) are matched. The skid joint angles are a matched set and the
edges of the fasteners should be exactly aligned.
NOTE: Do not bolt the skids to the housekeeping pad/oor until all of the piping
has been reassembled and tightened.
4. Ensure the skids are level and at before fastening the skids together with
the supplied bolts. The skids should be leveled front to back, side to side
and corner to corner. Failure to properly level the skids will result in piping
misalignment. A level or laser level should be used to verify skid alignment
(when a standard level is used, the length should be appropriate for the
skid). If assembling multi-component support stands, attach sections
using the supplied bolts through the tank frame mounting plates. These
should be hand tight until all of the piping is assembled.
NOTE: Note: skids are leveled at the factory using a laser level.
5. Connect the piping between the skids by matching the union connections
and/or ange stamps and tightening. Refer to the mechanical drawing as
necessary to conrm location of spool pieces etc. as the ange stamps are
shown on the drawing in hexagonal callouts. The ange stamps should
matched and aligned (the ange stamps should be directly across from
one another. Rotating a ange will result in piping misalignment). Bolts
should be hand tight until all of the piping is assembled. Refer to the
appropriate instructions to tighten the anges to the required torque
specications. Support pipe runs as required.
6. Ensure that a low point drain is installed in the piping.
7. Connect the conduit runs between the skids and tighten conduit
connectors.
8. Locate the supplied wiring for the equipment and pull wiring through
the appropriate conduit runs. Electrical wires are labeled for easy landing.
Connect all wiring per the Fulton supplied electrical drawings.
9. If a header is supplied, mount the header as shown in the mechanical
drawing.
NOTE: For piping supplied in sections, make up and connect hand tight until all
sections are in place to ensure sections align properly. Sections are match marked
for reassembly.