Questions? Please Contact Your Local Manufacturer’s Representative
3-5
SECTION 3 EDR-SOLA-IOM-2022-0216 OPERATION
! WARNING
Non-Fulton product information is for
reference purposes only. No Fulton
document should substitute for full
review of documentation available
from the component manufacturer.
4 CAUTION
When making changes to the controls
prole, a combustion analyzer is
required.
FIGURE 27 GAS DELIVERY SYSTEM
8. Changes to either the Shutter or Oset Adjustments on the valve will alter
combustion throughout the range. Once combustion setup is completed
at low and high re, perform the following steps a minimum of ten times
to verify O2 repeatability:
A. Ramp the boiler from low re RPM to high re RPM.
B. From the high re RPM, ramp back to the low re RPM, record the
combustion O2% measurement.
C. Turn the boiler o and allow post-purge to complete.
D. Turn the boiler back on and set to the low re RPM rate.
E. Verify O2% at low re is consistent with the value recorded in Step B.
If it is not, reference Valve Oset Adjustment in Step 6 for low re RPM
adjustments.
9. The low re manifold gas pressure absolute value must never be lower
than as recorded on the factory Test Fire Report. If the absolute value of
the measured low re manifold gas pressure is too low, increase the low
re RPM setting until the manifold meets or exceeds the factory Test Fire
Report low re manifold gas pressure valve.
10. Verify documented combustion settings are in the range specied by
Table 9.
NOTE: Proper set up of the Ignition Enrichment gas is crucial to the light-o of
the boiler and requires verication in the eld during initial commissioning. The
ignition enrichment setting must be veried during the annual preventative
maintenance.
High Gas Pressure
Switch
High Fire Shutter
Adjustment
Manifold Pressure
Test Port
2.5 mm Allen Low Fire
Oset
Low Gas Pressure
Switch
MBC Supply Gas
Pressure Test Port
Enrichment Regulator
(Integral Vent Limiter)
Enrichment Valve with
Outlet Test Port