EasyManua.ls Logo

Gaggia Milano ESPRESSO EVOLUTION - Circuit Priming; First Installation

Gaggia Milano ESPRESSO EVOLUTION
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
English
First installation
1 Remove the water tank (9), rinse it and ll it with cold water up to the MAX
level.
Circuit priming
The circuit must be primed upon machine rst operation or when the water tank is
empty:
1 Fill the water tank with cold water up to the MAX level.
2 Place a container under the Pannarello
3 Turn the steam/hot water knob counter clockwise and dispense water from
the Pannarello (8) until a steady jet comes out.
4 To nish dispensing, turn the steam/hot water knob clockwise and empty the
container.
Note: the machine does not signal a shortage of water in the tank; if the pump is
very noisy, rell the tank and prime the circuit.
2 Insert the power cord plug into a wall socket with suitable power voltage.
3 Press the on/off button (1), which will start ashing.
4 Place a container under the Pannarello (8), turn the steam/hot water knob (5)
counter clockwise and dispense hot water until all three on/off (1), coffee (2)
and steam (3) buttons ash simultaneously, signalling for you to turn the knob
off again.
5 The on/off button will come on steady and the coffee button (2) will start
ashing, turning steady once the factory set temperature is reached.

Table of Contents

Related product manuals