EasyManua.ls Logo

Gaggia Milano ESPRESSO EVOLUTION - Page 43

Gaggia Milano ESPRESSO EVOLUTION
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
43
English
13 Repeat the steps from point 10 until the MIN level in the water tank has been
reached.
14 Rinse the tank with fresh water and ll it up to the MAX level.
15 Place a large container under the brew group.
16 Turn the machine on by pressing the on/off button.
17 Press the coffee button and dispense water from the brew group until
dispensing automatically stops about halfway down the water tank.
18 Place a large container under the steam tube.
19 Turn the steam/hot water knob counter clockwise and dispense any water left
in the tank until the MIN level is reached.
20 To stop dispensing, turn the steam/hot water knob off by turning it clockwise.
21 Fill the tank up to the MAX level and dispense all the water from the brew
group until the MIN level is reached.
22 Repeat the operation dispensing a full tank from the steam tube as well.
23 The descaling cycle is now complete.
24 Insert the lter holder into the brew group after rinsing it with running water
and ret the Pannarello.
25 Hold the coffee and steam buttons for about 5 seconds; the on/off button will
ash for a moment and then machine is ready to brew coffee again once the
orange LED is reset.
Note: if necessary, prime the circuit as described in the relevant section.

Table of Contents

Related product manuals