EasyManua.ls Logo

GE AMX 4+

GE AMX 4+
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AMX4+ PERIODIC MAINTENANCE
GE Healthcare MODELS: 2169360, 2236420 & 2275938
REV 10 DIRECTION 2173227100
3
1-4 Inspection
In order to assure continued performance of this xray equipment, a periodic inspection program must be
established. It is the owner’s responsibility to supply or arrange for this service.
Periodic Maintenance can locate potential problems before they occur. Since maintenance checks involve cost, it
is not practical to attempt to assure zero failures. The following inspection requirements, with suggested
inspection intervals, are GE Healthcare recommendation for the most cost effective maintenance schedule.
Inspection intervals are based on average daily use of one eight hour shift. More frequent inspection is appropriate
where equipment use is above average. Equipment that regularly exhibits out of tolerance conditions should also
be inspected more frequently.
1-5 HHS Testing
The United States Department of Health and Human Services (HHS) has established performance requirements
for diagnostic xray equipment. These requirements are defined in Title 21 of the Code of federal regulations (21
CFR), and apply only to certain specified components identified as “certified equipment.”
The manufacturer of specified diagnostic xray components must certify that the components:
1. Perform as required by the HHS standard when installed, adjusted, and tested as specified in the
manufacturer s instructions to the assembler.
Refer to Direction 2173222100 AMX4+ Installation for HHS compliance testing as it pertains to the
AMX4+ during installation.
2. Will continue to comply when maintained in accordance with the manufacturers instructions.
The importance of HHS compliance testing cannot be over emphasized. Before starting Periodic
Maintenance procedures, review Direction 46013894 System Field Test for HHS. Pay particular attention to
“Introduction” (Tab 1 of Direction 46013894).
1-6 Tools and Materials
In addition to the standard service representatives tool kit, the following items are required:
Direction 2173221100, AMX4+ Ratings & Specifications and associated tools and materials.
Direction 2173224100, AMX4+ Functional Check and associated tools and materials.
Direction 2173225100, AMX4+ Service and associated tools and materials.
Direction 2190775100, Stranded Steel Cable Inspection, and associated tools and materials
SECTION 2 PM SCHEDULES
Your AMX 4+ does not require any planned maintenance to be performed for a 13 month period following
installation. PM should begin in the 13th month that follows your system’s installation anniversary date.
Following the 13th month, PMs should be performed at the frequency indicated in Section 3 that follows.
Note: The hand switch MUST be replaced at least once in every 3 years.

Other manuals for GE AMX 4+

Related product manuals