GE Consumer & Industrial
Electrical Distribution
BreakMaster
Load
Interrupter Switch
Installation and Maintenance
Question and Answer IconNeed help?

Do you have a question about the GE BreakMaster and is the answer not in the manual?

GE BreakMaster Specifications

General IconGeneral
BrandGE
ModelBreakMaster
CategorySwitch
LanguageEnglish

Summary

Section 1 - Introduction

1.0 Basic Description and Application

Provides a foundational understanding of the BreakMaster Load Interrupter Switch and its applications.

1.2 Safety Features

Outlines the built-in safety features designed to reduce hazards and ensure proper operating sequences.

1.3 Safe Practices

Specifies essential safety precautions for qualified personnel working with high voltage circuits.

Section 2 - Receiving

2.0 Receiving and Inspection

Details the process of inspecting switchgear upon receipt to check for damage or shortages.

Section 4 - Installation

4.0 Joining BreakMaster Enclosures

Details the procedures for connecting multiple BreakMaster enclosures together at shipping splits.

4.1 Connection of Switchgear to Transformer

Explains how to connect the switchgear to a transformer for both indoor and outdoor configurations.

4.4 Grounding

Describes the grounding arrangements for connecting the BreakMaster equipment to the station ground.

4.5 Medium Voltage Electrical Connections

Covers making electrical connections using supplied cables or bus bars.

4.6 Connections to Metal Clad Switchgear Assembly

Provides instructions for connecting the BreakMaster to metal clad switchgear, indoor and outdoor.

4.7 Connection of Customer Power Cables

Addresses the installation of customer power cables, ensuring adequate clearances and support.

4.11 Switch Inspection Before Setup

Provides a procedure for inspecting switch operation and contact resistance before initial startup.

4.11.1 Switch Alignment and Adjustment Procedure

Details the steps for aligning switch blades and adjusting contacts for proper operation.

Section 5 - Operation

5.2 Fuse Replacement Steps

Provides a step-by-step guide for safely replacing fuses in the switchgear.

5.4 Motor Operator

Details the components and operation of the motor operator assembly for automated switch control.

Section 6 - Maintenance

Section 7 - Selector Switch Configuration

Section 8 - Duplex Switchgear Configuration

Section 9 - Auto Transfer Switchgear (LIS-ATS) Configuration

Section 10 - Troubleshooting

Section 11 - How To Contact GE

11.0 GE Resolve

Information on contacting GE Resolve for post-shipment service and technical assistance.