Hardware Installation IST 004 (B+) 1536 x 2048 Flat Panel Portrait Monitor Connections
Page 41
n IST 004 (B+) 1536 x 2048 Flat Panel Portrait Monitor
Connections
Section 1: INTRODUCTION
This job card contains the instructions for interconnecting the workstation to other equipment and
components as part of the installation. Monitor cabling diagrams are provided to show the
interconnection of two or four B+ monitors to the appropriate video board slot positions at the rear of
the computer housing.
Section 2: Prerequisites
The site must be prepared for installation of the workstation. Refer to the Centricity RA600
Workstation Pre-Installation Manual for detailed information.
u
The appropriate line voltage, line frequency, and power supply line cords.
u
Ethernet connection.
u
Appropriate furniture for the Workstation (i.e. desk, chair, etc.).
Section 3: Cabling
Table 3-4 lists the part numbers of interconnecting cables used during installation.
Refer to Illustration 1-3 to see where various connectors are located on the computer housing.
Caution
!
The maximum magnetic field allowable for installing the GE
Centricity RA600 Workstation is 1 gauss to ensure proper operation.