7.1 PROCEDURES FOR SINGLE UPS
7.1.1 Start-up of the SG Series
Verify with open front door: Switch Q1 and Q2 must be open (Pos. O).
1. Connect the Utility power on the UPS.
(In case of separate inputs for Rectifier and
Bypass, connect both).
Power supply starts up.
Indicated with flashing alarm and buzzer
sound.
LED’s as indicated will be lit.
Press mute, to reset alarm and buzzer.
2. Close Q1 (Pos. I).
Bypass Utility connects to the output.
Rectifier starts automatically, blinking LED
indicates Soft-start.
At the end of Rectifier Soft-start, LED
remains lit.
Proceed with step 3 only, when the LED 3
remains constantly lit.
3. Connect the Battery to the UPS by closing
the external Battery Breaker Release.
4. Press inverter on ( I ) key.
Soft-start of Inverter indicated with
blinking LED.
At the end of Soft-start the LED remains
lit.
Automatic transfer from Bypass to
Inverter.
UPS output LED indicates Load on
Inverter.
The LCD must display on the main screen the status “LOAD ON INVERTER”.
END OF PROCEDURE
NOTE !
The Battery must be charged for at least 10 hours, in order to ensure the full
backup runtime in the case of a Utility Failure.
LED 3