7.3 PROCEDURES FOR PARALLEL SYSTEM
7.3.1 Parallel System start-up
Verify on all Units, with open front door: Switches Q1 and Q2 must be open (Pos. O).
1. Connect the Utility power on all UPS’s.
(In case of separate inputs for Rectifier and Bypass, connect both).
Power supply starts up. Indicated with flashing alarm and buzzer sounds.
LED’s as indicated will be lit.
Press mute, to reset alarm and buzzer.
First operated unit All other units of the system
2. Close Q1 (Pos. I) on all Units.
When closing Q1 on the last unit of the parallel system, the Bypass of all Units
connects to the Load.
Rectifiers start automatically, blinking LED indicates Soft-start.
At the end of Rectifier Soft-start, the LED remains lit.
LED’s service check turn OFF.
First operated unit All other units of the system
Proceed with step 3 only when the
LED 3 remains constantly lit on all
units of the parallel system.
3. Connect the Battery to all Units by
closing the external Battery Breaker
Release in sequence.
Continue
LED 3