EasyManua.ls Logo

GE Digital Energy SG 400 kVA - Maintenance Shutdown (Parallel System)

GE Digital Energy SG 400 kVA
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modifications reserved Page 54/86
OPM_SGS_USM_M40_M50_1US_V020.doc Operating Manual SG Series 400 & 500 kVA
7.3.2 Maintenance system shutdown (Load supplied from Q2 on all Units)
Initial status: Load supplied from all Inverters.
First operated unit All other units of the system
1. Press inverter off ( O ) key on all Units, and hold until the LED inside the Inverter symbol turns
OFF.
At no redundancy, the system will transfer to Utility supply.
First operated unit All other units of the system
2. Close Q2 (Pos. I) on all Units.
Load is now supplied from Utility in parallel from Bypass and Manual Bypass Q2 of all Units.
First operated unit All other units of the system
Continue

Table of Contents

Related product manuals