EasyManua.ls Logo

GE Digital Energy SG 400 kVA - Page 74

GE Digital Energy SG 400 kVA
86 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modifications reserved Page 74/86
OPM_SGS_USM_M40_M50_1US_V020.doc Operating Manual SG Series 400 & 500 kVA
3. Disconnect the Battery from the Unit to separate (only for UPS configuration without
external Battery Breaker Release).
Wait 5 minutes for DC-Link Capacitors to discharge.
Before you proceed with any kind of
intervention on the UPS, make sure the DC-Link
voltage be less than 15 VDC.
Ub=15V
Ib= + 0A
Battery Temp= + 20
°
C
Charge Level= 87%
Autonomy = 12min
metering
alarms
parameters
+
ok
4. Disconnect the Utility supply from the separated Unit.
First operated unit All other units of the system
END OF PROCEDURE
NOTE !
For any further intervention could nearest Service Center.

Table of Contents

Related product manuals