EasyManua.ls Logo

GE GTWS8655DMC - Platform Assembly Procedures

GE GTWS8655DMC
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Bottom of Subwasher
Platform Assembly Removal
Remove the 1 and 5/16 inch hub
nut. The Torque when re-
installing the Hub Nut is 100 ft.
lbs.
First remove the impeller
held down by a 7/16
bolt. Lift the impeller up.
The coupler may come
off with the impeller. If
not, remove it also.
Top center of the impeller with
cap removed exposing the 7/16
bolt.
Torque Limiter tool is use with
impact gun to achieve the proper
torque.

Table of Contents

Other manuals for GE GTWS8655DMC

Related product manuals