Innova 2000 Cardiovascular Imaging System
GE Medical Systems
Pre–Installation Manual
REV 5 pim 2337741–100
143
JOB CARD PIST044–001 – Innova 2000 System Interconnect
Time: 9 h 00 min – Personnel: 2 field engineers = 18 h 00 of workload 1 of 10
1 SUPPLIES
None.
2 TOOLS
Standard Tools: screwdrivers, drilling machine.
3 SAFETY PRECAUTIONS
Follow the procedure to unpack the spool.
Attach the power strip on wall to respect regulatory constraints.
4 PREREQUISITES
Gullets, raceways in place.
Different subsystems shall be color coded to check the cable distribution in real time:
Yellow for POSTIT cabinet.
Orange for ACAB cabinet.
Red for MPPU cabinet.
Purple for X–Ray tube chiller & Detector conditioner – LC gantry.
Blue for Gantry.
Brown for Table.