C.16
Dimensional drawings
A
B
C
X
M-PACT Plus
Front access connection
Fixed pattern
Type S, N - 3 pole - Frame size 2, ln = 3200A to 4000A
Type H - 3 pole - Frame size 2, ln = 800A to 4000A
Type S, N - 4 pole - Frame size 2, ln = 3200A to 4000A
Type H - 4 pole - Frame size 2, ln = 800A to 4000A
Center line of
operating panel
Center line of
operating panel
Minimum clearance to cassette side
Connected
Disconnected
Test
to door
Copperwork must be supported within 200 mm of breaker
connections-busbars or cables. All connections to be tightened to 50Nm.
Center line of
operating panel
Center line of
operating panel
Minimum clearance to cassette side
Connected
Disconnected
Test
to door
Copperwork must be supported within 200 mm of breaker
connections-busbars or cables. All connections to be tightened to 50Nm.