EasyManua.ls Logo

GE SF6 - Page 213

GE SF6
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Grid Solutions
PS 0003EN
04
G. BERNARD
1998-08-12
J. VIAT
2011-03-21
1 / 3
Sheet N°
Revision
Written by
Date
Signature
Approved by
Date
Signature
Page
SAFETY SHEET
PRESSURIZED EQUIPMENT
CAUSE OR ORIGIN OF HAZARD.
Our equipment includes gas pressure assemblies (SF
6
, nitrogen, air, etc.) or fluids (oil).
WORK REQUIREMENTS.
Comply with the storage, transport and operating instructions supplied with our equipment.
Before initial filling and pressurizing, check the overall condition of the shielding concerned :
- no signs of impact, splitting or chipping on the porcelain components, etc.,
- no visible damage to hoses and/or rigid pipes (cuts, folds, corrosion, etc.) or to fittings and metal
protection (accumulators, tank, etc.).
SAFETY INSTRUCTIONS.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, all work on pressurized equipment must be carried out by qualified personnel.

Related product manuals