SAFETY SHEET
CHEMICALS
CAUSE OR ORIGIN OF HAZARD.
Generally speaking, the products used for installation and commissioning are bought chemical products,
namely :
- Hydraulic oil - Grease - Loctite
- Touching-up paint - Isopropanol - Drying agents
These must be kept in their original packing and the tops replaced after use.
Some packing products require careful handling as they may contain preservatives.
WORK REQUIREMENTS.
As a general rule, chemical products must be used and stored away from any source of heat. Smoking is to be
avoided.
Avoid contact with the skin and any splashes to the eyes.
Take the basic health and safety precautions.
Products and packing must be destroyed in accordance with local environmental regulations.
SAFETY INSTRUCTIONS.
OBSERVE ALL GENERAL INSTRUCTIONS GOVERNING INSTALLATION, COMMISSIONING AND
OPERATION IN ACCORDANCE WITH CURRENTLY ACCEPTED PRACTICES AS WELL AS THOSE LAID
DOWN IN THE DOCUMENTATION SUPPLIED WITH THE EQUIPMENT.
Other products: SF
6
(see relevant sheet)