SAFETY INSTRUCTIONS
PACKING
TRANSPORT
INSTALLATION
START-UP
OPERATION
MAINTENANCE
SCRAPPING &
RECYCLING
1 High Tension.
1.1 Comply with the regulations governing the work station.
X
X
X
X
X
1.2 In the case of items equipped with capacitors, make
sure they are discharged prior to removal and short-
circuited while work is being carried out.
X
X
2 Low Tension.
2.1 Prior to any work on the low-tension circuit or
equipment, cut off the power supply.
X
X
X
X
X
2.2 When replacing an electrical component on the control
equipment, follow the safety instructions shown in the
"Machinery" safety sheet.
X
X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE SF6 and is the answer not in the manual?

GE SF6 Specifications

General IconGeneral
BrandGE
ModelSF6
CategoryCircuit breakers
LanguageEnglish

Related product manuals