SAFETY INSTRUCTIONS
PACKING
TRANSPORT
INSTALLATION
START-UP
OPERATION
MAINTENANCE
SCRAPPING &
RECYCLING
1 Moving Parts.
1.1 Before any work is carried out on transmission
components, ensure that the control equipment has
been deactivated.
X
X
X
X
X
2 Spring-operated Mechanism.
2.1 Before any work is carried out, cut off all power to the
reset motor.
X
X
X
X
X
2.2 Deactivate the opening and closing springs in
accordance with Grid Solutions instructions.
X
X
X
X
X
2.3 Make sure that all safety rules are complied with while
the work is being carried out.
X
X
X
X
X
3 Hydraulic Mechanism.
3.1 Before any work is carried out, cut off power to the
motor pump.
X
X
X
X
X
3.2 Reduce the pressure of the hydraulic circuit to zero.
X
X
X
X
X