EasyManua.ls Logo

GE SF6 - Page 289

GE SF6
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Installation of operating device
GE Information L31- 7902EN/02
3/12
11- 2016
Preparing the pole operating shaft
Introduction
For transport the pole is fitted with a securing tool (4) and a safety plate (5),
temporarily attached to the end of the handle (12)
To fit the operating lever , you must:
a - Remove the securing tool (4).
b- Manually open the pole.
c - Refit the securing tool (4) (“open” position).
d - Remove the safety plate (5).
4
5
12
5
7
Grease
Check the presence of grease (ASEOL 0- 365.2) on the pole operating shaft.
Continued on next page.

Related product manuals