GE Information04- 2017 D1736EN/03
6/10
Installation
Erection general instructions
L30- 002EN/03
T ightening torques
L31- 001EN/03
Erection general procedures
L31- 003EN/03
Checking for presence of nitrogen (N
2
) in pole parts
L31- 064EN/05
The installation procedure (advised), developed
below, imposes a lifting equipment with the following
characteristics :
NOTE
: If it is impossible to obtain the advoc-
ated lifting equipment, one “complementary
installation procedure” is supplied in annexes.
3,000 daN)
(minimum)
H+2m
H
H+1m
Support- frame assembly
L31- 139EN/03
Column - chambers coupling
L31- 7137EN/02
T ipping down the pole of the circuit- breaker
and vacuum operation
L31- 721EN/04
Installing terminals with preparation of contact sur-
faces
L31- 731EN/04
Installing the capacitors
L31- 741EN/05
Installing stress- shields on the interrupting
chambers
L31- 7510EN/02
Lifting and positionning the pole
L31- 7606EN/04
Installing the operating device
L31- 7902EN/02
Continued on next page.