Installation
Supporting frame assembly
GE Information L31- 139EN/03
2/10
01- 2017
Components necessary for the operation
Necessary product
Grease MOBILPLEX47 - MOBILUXEP3 (screws greasing).
Necessary tools
List of the tools necessary for the installing:
Mark Diagram Designation Number
(1)
Lifting strap
(3 m)
2
Handling
The support- frame assembly operations and lifting
the pole should be performed by at least two
per-
sons
.