Installation
Coupling of column and chambers
GE Information L31- 7137EN/02
3/18
11- 2016
Preparing t h e breaking chambers
Removing the
chamber casing
Remove the side panels and cover from the case.
Rotating
the chambers
Using two flexible slings, swing the chambers through 180 then level the
transport covers.
NOTE
: Turn the breaking chamber casing (2) so that the face
with the two ’humps’ is facing the lifting equipment.
2