EasyManua.ls Logo

GE UVis-920 - Page 30

GE UVis-920
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IllustrationActionStep
Connect the two optical fibers to the housing by
carefully inserting them into the sockets and tighten-
ing the nuts fingertight using the fiber detachment
tool supplied. Do not overtighten.
Note:
The optical fiber end with black shrinking tubing shall
be connected to the rear socket connector on the side
of Monitor UVis-920.
3
Fiber detachment tool
Slide the rubber sleeves on the two optical fibers
onto the connectors. Make sure that the sleeves are
pushed tight to the housing to prevent dust, fluid or
light entering the connection.
4
Remove the red protective caps from the inlet and
outlet of the flow cell and connect the tubing with
1/16" fingertight connectors.
5
Mount the cell holder cover by pushing it onto the
cell holder.
6
30 Monitor UVis-920 Operating Instructions 29055049 AD
4 Installation
4.5 Installing the flow cells

Related product manuals