RS5-34 Telescopic Handler SINGLE CHAIN REPLACEMENT
PRINTED IN U.S.A. 705-4 913241
Template
Name:
OML
_
2
_
col
907871
Template Date: 1994_04_22
Alt
=
to
hide
template
information
Alt+ to display template information
STEP 17
G1005039
Install the clevis block (1) to the outer boom using the
two bolts and washers (2). Use Loctite
271 (red)
Thread Lock (or equivalent) on the threads of the
bolts.
STEP 18
Pull the inner boom out of the intermediate boom as
far as the single chain will allow to remove any chain
slack.
STEP 19
G1655MP
Pull the double chain assemblies up and over the
sheaves and place each clevis through the mounting
holes in the outer boom, securing each with one nut.
STEP 20
Torque the double chains. See Section 702 of this
manual for correct procedure.
STEP 21
G1657MP
Install the lock nut on each clevis.
STEP 22
Reinstall the extend cylinder front pivot pin into the
inner boom. See Section 608 of this manual for
correct procedure.
STEP 23
G0805199
Reinstall the cover (1) on the rear of the boom with
the four bolts (2).
STEP 24
Start the engine and check boom operation in a clear
area.
STEP 25
Shut down the engine and check for hydraulic fluid
leaks. Correct any leakage found.
1
2
2
2
1
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com

Table of Contents

Other manuals for Gehl RS6-34

Related product manuals