ENG GEMAŞ STEAM GENERATOR AND CONTROL PANEL INSTRUCTIONS MANUAL V2.1
Description About Assembly
While assembling the product, it must be ensured that the electrical energy coming to the
product is cut off.
The location of the Steam Generator requires a place protected from moisture outside the
steam room.
Piping length max. 7 meters and a small number of elbows and reducers that can be used for
the pipe system must be used to create counter pressure. Pressure can cause steam to
condense and not reach the steam room.
Location of the steam generator; Choosing a high choice according to the steam inlet of the
steam room is that they are lower together.
In order to obtain high efficiency from the product, it must be ensured that the connections are
correct.