2 – ASSEMBLY - INSTALLATION
Assembly and installation must be carried out by an authorized service or qualified
electrician and plumber. Otherwise, the manufacturer and the seller company cannot be
held responsible for the problems that may arise due to incorrect installation and
commissioning. No repair, maintenance, or replacement parts can be requested under the warranty.
For the smooth operation of the device and the safety of life and property, make sure that the
following conditions are met by taking the safety precautions regarding electricity and water before
starting the installation.
Installation Scheme
Electricity Description
Electrical and mechanical measures have been taken to protect the safety of life and
property in the Salt Chlorine Generator. For the electrical precautions to function, the
leakage relay and grounding warnings must be taken into consideration.
• Leakage Current Relay: Use a leakage current relay that is CE certified and you are sure that it is
working. Make sure the relay you will use controls the generator. Test the Leakage Current Relay strictly
every year.
The manufacturer/seller company cannot be held responsible for any problems that may
arise due to the failure of the Leakage Current Relay being installed, its subsequent
malfunction, cancellation, connection of the ground wire, and poor grounding.
• Supply Cable: Device supply cable must be at least 3x1.5 mm.
Grounding: Make sure grounding in your facility is well done. Always connect the grounding line of the
installation to the device. If necessary, test the ground line. You must also see the voltage value you see
between phase and neutral between phase/ground.
The voltage value between neutral and ground must be maximum 2 VAC.
L-N: 220V AC L-PE: 220V AC N-PE: Maximum 2V AC