Fuel Conversion/Gas Connections
Installation Guidelines for 60 Hz PowerPact™ 23
LP Vapor Installation (typical)
Figure 5-6. LP Vapor Installation (typical)
LP BTU = ft
3
/h X 2500
Megajoules = m
3
/h X 93.15
A. Sediment trap
B. BTU and pressure decal
C. Minimum distance from side obstruction—see Site Selection
D. Flexible fuel line
E. Manual shutoff valve (pressure port optional)
F. Check distance with gas provider
G. Reinforcing rod
H. Clamp
J. Secondary fuel pressure regulator
K. Manual shutoff valve (pressure port optional)
L. Primary fuel pressure regulator
M
.
Size fuel tank large enough to provide required BTUs for generator and ALL
connected appliance loads.
NOTE: Compensate for weather evaporation.